Lift Permission from MCD – Complete Guide with Address & Details
Are you looking for Lift permission from MCD in Delhi? Installing a lift in a residential or commercial property requires Lift Permission / Lift NOC from MCD (Municipal Corporation of Delhi). This approval ensures legal compliance, structural safety, and adherence to building bye-laws. Below is a detailed guide with process, documents, benefits, FAQs, and MCD addresses for your convenience. Why You Need Lift NOC from MCD Documents Required for Lift Permission / NOC from MCD ☑️ Approved Building Plan with designated lift area☑️ Occupancy / Completion Certificate☑️ NOC from Builder, Society, or RWA☑️ Structural Stability Certificate by a licensed engineer☑️ Undertaking of Fire, Electrical & Safety Compliance☑️ Lift Manufacturer’s details (capacity, model, type)☑️ Annual Maintenance Contract (AMC) with authorized agency Process to Obtain Lift Permission from MCD 1️⃣ Application Submission – Apply online (if available) or at your local MCD zonal office.2️⃣ Attach Documents – Submit all required certificates and approvals.3️⃣ Inspection – MCD officials inspect lift shaft, machine room, and safety provisions.4️⃣ Verification – Documents and inspection reports are reviewed.5️⃣ Approval – MCD issues the official Lift NOC / Permission, after which installation is legally permitted. Addresses of MCD Zonal Offices The Municipal Corporation of Delhi (MCD) has multiple zonal offices. Applications for lift permission must be submitted in the relevant zone where your property is located. Main Head Office: Municipal Corporation of Delhi (MCD)Dr. Shyama Prasad Mukherjee Civic Centre,Minto Road, New Delhi – 110002 Major Zonal Offices: 📞 MCD Helpline Number: 155305🌐 Official Website: mcdonline.nic.in (Applicants should confirm the exact zonal office based on their property’s location.) Benefits of Getting Lift Permission from MCD Top Companies That Assist with Lift NOC in Delhi FAQs on Lift Permission from MCD Q1. Is MCD lift permission mandatory?Yes. Without it, lift installation is illegal. Q2. How long does it take to get Lift NOC?Generally 4–8 weeks, depending on paperwork and inspections. Q3. Can societies in old buildings apply for a lift?Yes, provided they submit a structural stability certificate and NOC from residents. Q4. Can the process be done online?In some zones, yes. Otherwise, applications must be submitted at the local MCD office. Q5. What happens if I install a lift without MCD permission?MCD may impose fines, seal the lift, or take legal action. Lift Permission from SMDC




